Universities, government buildings, and public facilities that stay operational during construction. We manage phased renovations on occupied campuses — coordinating construction sequencing, stakeholder communication, and operational continuity from pre-design through closeout.
New academic facility on Dartmouth's central campus housing Studio Arts, Film & Media Studies, a 243-seat auditorium, and gallery spaces. Required specialized ventilation for studios, acoustic isolation, and precise environmental controls for galleries.
Phased renovation and infrastructure upgrade within UMass Amherst's Southwest Residential Area serving approximately 5,500 students. Full site/civil and landscape improvements across multiple phases with active student access maintained throughout.
Full gut renovation of an obsolete academic wing at Massachusetts College of Art, repurposed to house the campus safety department. Scope included complete demolition and buildout of interior finishes, MEP systems, and access control infrastructure. Concurrently managed full replacement of the base building cooling tower, coordinating shutdown sequencing to minimize disruption to the occupied campus.
310,000 SF student housing on Northeastern's campus. Mixed-height residential complex (8 to 20 stories) with ground-floor retail. First high-rise student housing project in Boston to achieve LEED Platinum certification.
Over 1.5 million square feet of life science space delivered in the Cambridge and Greater Boston market — including headquarters for Moderna and Pfizer. These projects demand specialized MEP coordination, precise environmental controls, and construction sequencing that keeps adjacent lab operations running.
Life science complex by MITIMCo comprising two connected buildings with a three-level, 650-space below-grade parking garage. Anchored by Pfizer with additional tenants including CRISPR Therapeutics and LabCentral.
Corporate headquarters and research hub for Moderna. Most sustainable laboratory building in Cambridge with a geothermal system and triple-glazed windows eliminating perimeter heat. IIDA "Best in Show" Award winner.
Lab building by National Development and Alexandria Real Estate Equities. Repositions the former Mount Auburn Club site with lab/office space and a 525-car garage connected by a second-story bridge.
Research facility for Philips' North American hub designed by Perkins&Will. Includes laboratory space, customer demonstration labs, and office areas.
Class A life science facility developed from a vacant 1980s office building adjacent to the Alewife MBTA station. Added approximately 80,000 SF, replaced all mechanical systems, improved ceiling heights, and delivered a new entry and facade — while retaining the existing footprint to secure all approvals within six months.
Historic buildings, campus redevelopments, and aging facilities repositioned for modern use. This work demands entitlement navigation, preservation compliance, concealed-condition management, and phased construction on constrained sites.
Full restoration of the historic Hoffman Building with two new upper floors and a mechanical penthouse. Preserved original brick walls integrated into modern open-plan interior. Includes flagship retail and the Converse Rubber Tracks recording studio. 2015 Preservation Achievement Award.
Vacant 1980s office building repositioned into Class A life science facility. Added 80,000 SF, replaced all mechanical systems, improved ceiling heights, and delivered a new facade — while retaining the existing footprint for a fast-track entitlement strategy.
Gut renovation of an obsolete academic wing repurposed for campus safety operations. Complete demolition and buildout of finishes, MEP systems, and access control — plus base building cooling tower replacement coordinated across an occupied campus.
Graduate student and young professional housing spanning three new wood-frame podium buildings plus adaptive reuse of a historic 1909 Boston Landmark monastery on a 12-acre hilltop. 25-foot retaining wall, asbestos remediation, and coordination across 20+ permit approvals.
Sensitive compartmented information facilities demand specialized construction protocols, RF shielding, acoustic protection, and strict chain-of-custody documentation. Our partners bring direct ICD 705 and TEMPEST accreditation experience. Our data center work covers hyperscale campus acquisition, entitlement strategy, and utility coordination at scale.
Buildout for a large defense contractor in the New England region. ICD 705 compliant design incorporating acoustic protection, RF shielding, video surveillance, and access control systems. Accreditation achieved within 3 months of construction completion.
Led a 60-day due diligence sprint to close on a 200MW speculative site in core Loudoun County with an on-site 300MW substation parcel. Secured increased building height approvals (adding 30% potential RSF), county site plan approvals, and state wetlands approvals.